|
| TCz Synchronous |
| TCz | secondary site |
| ||
| Synchronous |
|
Tasks |
| JNLVOL |
|
| |
|
|
|
data VOL |
|
|
Primary site | Master |
|
JNLVOL |
| |
| URz | Sec. data VOL |
|
| |
|
| Restore URz |
|
| JNLVOL secondary site |
Black arrow indicates copy direction. If an arrow is solid (not dotted), the pair is in Duplex status.
Prm data VOL: primary data volume
Sec. data VOL: secondary data volume
JNLVOL: journal volume
| Tasks | TCz Synchronous |
TCz | secondary site | |
| ||
data VOL |
| |
Synchronous |
| |
|
| |
|
| Master |
|
| JNLVOL |
| URz | |
|
|
Primary site JNLVOL
Sec. data VOL
|
|
| Restore | URz |
|
|
| JNLVOL | secondary site |
|
| Tasks | TCz Synchronous | |
| TCz |
| secondary site | |
|
|
| ||
| Synchronous |
|
| |
|
|
|
| |
|
|
| JNLVOL | |
|
|
|
|
|
data VOL |
|
|
|
|
Primary site | Master |
|
|
|
JNLVOL |
|
|
| |
|
|
|
| |
| URz |
|
| Sec. data VOL |
|
|
|
| |
|
|
| Restore | URz |
|
|
| JNLVOL | secondary site |
Figure 10-2 Recovering from Failures in the Primary Site
Recovering from Failures in the Primary Site (When Delta Resync Operation is
Performed)
If a disaster or failure occurs only in the primary site in 3DC
To transfer your business tasks to the TCz Synchronous secondary site, follow the procedure below. Business Continuity Manager is used in this procedure:
1.Use Business Continuity Manager to execute the YKSUSPND REVERSE command on the TCz Synchronous pair.
TCz Synchronous pair will be split and the copy operation stops temporarily.
2.Use the TCz Synchronous remote volume to resume your business tasks.
Chapter 10 Usage Scenarios |