Hitachi MP-96RD625-01 manual Overview of Split Operation

Models: MP-96RD625-01

1 314
Download 314 pages 57.88 Kb
Page 98
Image 98

Using At-Time Split Function When Combining URz with ShadowImage for z/OS® (SIz)

When URz secondary data volume (S-VOL) is specified as S-VOL of SIz pair, you can specify the time of backup copy operation for URz by using the At- Time Split function of the Business Continuity Manager. This backup copy operation is called the split operation. The time when split operation is executed is called the split time.

Business Continuity Manager

Primary data volume

 

URz

 

 

 

Master journal

- Secondary data

 

Restore journal volume

volume

 

 

volume

 

 

 

 

 

 

 

 

- SIz S-VOL

 

 

 

 

Execute split

 

 

Execute split

 

Execute

split

operation at 12:00

 

operation at

operation

at 11:00

 

10:00

 

 

 

MCU

SIz T-VOL

SIz T-VOL

SIz T-VOL

Back up copy at

Back up copy at

Back up copy at

10:00

11:00

12:00

 

RCU

 

Figure 3-21 Overview of Split Operation

The At-Time Split function has the following restrictions when URz and ShadowImage for z/OS® are used in conjunction:

The At-Time Split function can be executed by Business Continuity Manager, but cannot be executed by Storage Navigator.

You can execute split operations on SIz pairs that belong to ShadowImage for z/OS® consistency groups.

You can apply one split operation to one ShadowImage for z/OS® consistency group.

You can apply up to three split operations to one journal group (equivalent to three ShadowImage for z/OS® consistency groups).

One SIz S-VOL can be paired with up to three SIz T-VOLs. This enables you to create a maximum of three generations of backup data.

3-32

Chapter 3 Preparing for Universal Replicator z/OS Operations

Hitachi Universal Replicator for IBM /OS User’s Guide

Page 98
Image 98
Hitachi MP-96RD625-01 manual Overview of Split Operation