3.Use Business Continuity Manager to execute the YKRESYNC REVERSE command on the TCz Synchronous pair.

The copy direction of the TCz Synchronous pair will be reversed.

4.In the either cases when the primary/secondary relationship of the TCz Synchronous pair is not reversed (i.e., the copy direction is not reversed as illustrated in the upper-right picture in Figure 10-3), or when the primary/secondary relationship of the TCz Synchronous pair is reversed (i.e., the copy direction is reversed as illustrated in the lower-right picture in Figure 10-3), use Business Continuity Manager’s YKRESYNC DELTAJNL command to perform delta resync operation on the volume in the TCz Synchronous secondary site. The status of the data volumes of URz pair changes as explained in the following table.

Table 10-1 Changes of URz Pair Status by Delta Resync Operation (When Recovering from Failures in the Primary Site)

URz Pair

 

Pair Status before Delta Resync

Pair Status after Delta Resync Operation

 

 

Operation

 

 

 

 

 

 

 

 

 

 

Primary Data

Secondary

Primary Data Volume

Secondary Data

 

 

Volume

Data Volume

 

Volume

URz pair between TCz

Duplex or

Duplex or

Hold

Hold

Synchronous primary site

Suspend

Suspend

 

 

and URz secondary site

 

 

 

 

 

 

 

 

 

URz pair between TCz

Hold

Hold

Duplex or Pending

Duplex or Pending

Synchronous secondary

 

 

Duplex

Duplex

site and URz secondary

 

 

 

 

site

 

 

 

 

 

 

 

 

 

 

Note: In order to transfer business tasks back to the primary site, please remove failures in the primary site and other locations, and then follow the instructions in section Transferring Business Tasks from TCz Secondary Site to the Primary Site (When Delta Resync Operation is Performed in 3DC multi-target configuration).

10-12

Chapter 10 Usage Scenarios

Hitachi Universal Replicator for IBM /OS User’s Guide

Page 284
Image 284
Hitachi MP-96RD625-01 manual URz Pair, Operation Primary Data