Update Copy Operation

2-20

Journal Group Operations

2-20

Timer Type Option

2-21

Journal Group Operations

2-21

Read and Write I/O Operations During URz Operations

2-22

Secondary Data Volume Write Option

2-23

Secondary Data Volume Read Option

2-23

Difference Management

2-23

Journal Processing

2-24

Journal Processing at the Primary Storage System

2-24

Types of Journal

2-25

Journal Processing at the Secondary Storage System

2-25

Storing Journal at the Secondary Storage System

2-25

Selecting and Restoring Journal at the Secondary Storage System

2-26

URz Delta Resync Operation

2-28

Journal Obtain in TCz Synchronous Secondary Site

2-28

Switching the Master Journal Group of URz

2-30

Pair Status

2-33

Suspend Types

2-36

Suspension Condition

2-38

Business Continuity Manager Support

2-39

Command Device

2-42

Preparing for Universal Replicator z/OS Operations

3-1

 

Requirements and Restrictions for URz

3-2

 

System Requirements

3-2

 

Disk Track Format

3-4

 

One-to-One Volume Copy Operations

3-4

 

Duplicate VOLSER (Volume Serial Number)

3-5

 

Volume Types

3-5

 

The Maximum Number of Pairs

3-8

 

Journal Group

3-11

 

Accessing URz Primary Data Volume and Secondary Data Volume

3-12

 

Cache and Nonvolatile Storage (NVS)

3-12

 

Duplicate Volumes

3-12

 

Installing the Hardware

3-13

 

Setting up Remote Copy Connections

3-14

 

Enabling the URz Option(s)

3-16

 

Using Multiple Primary and Secondary Storage Systems

3-16

 

Basic Behavior When Using Multiple Primary and Secondary Storage Systems3-18

 

Hardware Configuration for Multiple Primary and Secondary Storage Systems3-20

 

Connections Between Secondary Storage Systems

3-21

vi

Contents

 

 

 

 

 

Hitachi Universal Replicator for IBM /OS User’s Guide

 

Page 6
Image 6
Hitachi MP-96RD625-01 manual Preparing for Universal Replicator z/OS Operations