BERT Technical Articles

SESs for which the previous two seconds were also SESs. Some BERTs will graph these and other errors over time to illustrate clumping or mark events.

How long is long enough?

Every time the BERT detects an error, it logs another check mark in the error column and updates the other various measurements it makes. At what point, however, can you say that the various measurements give an accurate representation of your system? Consider: With a BER of 10-15, a 1 Gb/s system will encounter an error every 11.5 days.

A valid test certainly requires more than a single error to offer statistically relevant results (see Table 1). Random sampling is just that - random. Your design may have encountered a burst of errors that won't happen again for another three months (perhaps due to some unusual electrical interference), but if the sample was not large enough to tell you otherwise, you would consider the device bad. Also consider the inverse where a bad system appears good.

Table 1. Length of Test for Evaluation of 1 Gb/s System

 

68% confidence

90% confidence

BER

(10 errors)

(100 errors)

10-9

10 seconds

1.7 minutes

10-12

2.8 hours

1.2 days

10-15

116 days

3.17 years

Testing until you have ten errors offers only a 68% confidence in the BER, while 100 errors offers 90% confidence. Think about how long it would take to obtain 90% confidence in systems running at 1 Mb/s or 19.2 kilobaud, if you were looking for a 10-9BER. So how do you get around taking 3.17 years to thoroughly test that 1 Gb/s system with a BER of 10-15?

Stressing the transmission system

One answer is to stress the system and increase the error rate. Error rates measured while a system is under stress can be extrapolated to lower error rates for the system with no stress. First, take a thorough reading of the design's performance under normal operating conditions. Then, by collecting BERs for the system under different levels of stress, you can determine a performance curve.

For example, adding 3 dB of attenuation to impair signal levels, (see Figure 1), the system might show a BER of 5 x 10-6. This corresponds to a BER of 10-10for the system without attenuation stress. The goal is not to determine the actual error rate, but the upper bound on the error rate. By stressing the system and increasing the error rate experienced, testing can take significantly less time (more errors in a shorter time), while still offering an accurate representation of the system's quality.

B-14

GB1400 User Manual

Page 188
Image 188
Tektronix 071-0590-00 user manual How long is long enough?