Chapter 5 Installing and Removing Exterior Components

Installing or Removing the Front Side Exterior Components

The bezel is attached to the front of the chassis with four ball studs.

b.Pull the bezel firmly towards you to detach it.

Step 3 Remove all screws on either side of the cable management bracket.

Tip For ease of removal, remove the outer screws first.

Caution Be careful not to damage the plastic bracket arms.

Step 4 Set the bracket carefully aside.

What to Do Next

You may now install a replacement cable management bracket, if necessary.

Reinstalling the Cable Management Bracket

The Cisco CRS 8-slot line card chassis arrives preinstalled with a horizontal cable management bracket on the front of the chassis and an optional horizontal cable management bracket available for the rear of the chassis. The cable management system organizes the interface cables that enter and exit the different cards, keeping them out of the way and free of sharp bends. If you need to reinstall the cable management bracket, this section describes how to install that bracket in the chassis.

Caution Excessive bending of interface cables can damage the cables.

Figure 5-2 Cable Management Bracket

122789

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Installation Guide

 

OL-6256-17

5-3

 

 

 

Page 163
Image 163
Cisco Systems OL-6256-17 manual Reinstalling the Cable Management Bracket, What to Do Next