Cisco Systems OL-6256-17 manual Installing a DC PEM or AC Rectifier

Models: OL-6256-17

1 182
Download 182 pages 23.48 Kb
Page 54
Image 54

Chapter 2 Installing and Removing Power Components

How to Install or Remove Fixed Configuration Power Components

Installing a DC PEM or AC Rectifier

This section describes how to install a DC PEM or AC rectifier in the Cisco CRS 8-slot line card chassis. For information on the difference between the power types, see the “DC Power Systems” section on page 2-6and the “AC Power Systems” section on page 2-11.

The DC PEM or AC rectifier is installed into the front of the chassis, and mates with the PDU that is installed on the back of the chassis (see the “Installing a PDU” section on page 2-15for information). Although there are differences among the different DC PEM or AC rectifiers (AC Wye, AC Delta, and DC), they are installed in the same manner. (Figure 2-12shows an AC Wye rectifier for reference.)

Figure 2-12 Fixed Configuration AC Wye Rectifier

4

1

 

OT

 

 

 

LLM CB

FLT POWER

 

 

TMP FAACIL

 

 

 

 

OK

 

2

 

 

 

 

 

 

3

 

 

1

Power switch

 

3

Handle

2

Module air filter

 

4

Captive screws

122286

Prerequisites

Before performing this task, make sure that the PDU has been installed (see the “Installing a PDU” section on page 2-15) and remove any cosmetic covers.

Required Tools and Equipment

You need the following tools and part to perform this task:

ESD-preventive wrist strap

6-in. long number 1 Phillips screwdriver

Fixed configuration power module

AC rectifier Cisco product number CRS-8-AC-RECT=

DC PEM Cisco product number CRS-8-DC-PEM=

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Installation Guide

2-22

OL-6256-17

 

 

Page 54
Image 54
Cisco Systems OL-6256-17 manual Installing a DC PEM or AC Rectifier, Fixed Configuration AC Wye Rectifier