
Chapter 2 Installing and Removing Power Components
How to Install or Remove Fixed Configuration Power Components
Installing a DC PEM or AC Rectifier
This section describes how to install a DC PEM or AC rectifier in the Cisco CRS
The DC PEM or AC rectifier is installed into the front of the chassis, and mates with the PDU that is installed on the back of the chassis (see the “Installing a PDU” section on page
Figure 2-12 Fixed Configuration AC Wye Rectifier
4
1 |
| OT |
|
|
| LLM CB | FLT POWER |
| |
| TMP FAACIL |
| ||
|
|
| OK |
|
2 |
|
|
|
|
|
| 3 |
|
|
1 | Power switch |
| 3 | Handle |
2 | Module air filter |
| 4 | Captive screws |
122286
Prerequisites
Before performing this task, make sure that the PDU has been installed (see the “Installing a PDU” section on page
Required Tools and Equipment
You need the following tools and part to perform this task:
•
•
•Fixed configuration power module
–AC rectifier Cisco product number
–DC PEM Cisco product number
Cisco CRS Carrier Routing System
|
| |
|