C H A P T E R 2
Installing and Removing Power Components
This chapter provides instructions on how to install and remove Cisco CRS Carrier Routing System
Power Systems Overview
There are two options for power systems: the fixed configuration power system and the modular configuration power system. Power components are not interchangeable between the fixed and modular configuration power system.
•Fixed configuration power system consists of two power distribution units (PDUs) and either DC power entry modules (PEMs) or AC rectifiers. The AC version requires
•Modular configuration power system consists of two power shelves and either AC or DC power modules (PMs). However, unlike the fixed configuration power system, the AC version of the modular configuration power system requires
Note In a fixed configuration AC or DC power system, PDU refers to the power component that connects to the AC rectifier or DC PEM.
Note In a modular configuration AC power system, PDU refers to the Cisco CRS PDU that converts
Cisco CRS Carrier Routing System
|
| ||
|
|