Chapter 2 Installing and Removing Power Components
How to Install or Remove Modular Configuration Power Components
Figure 2-31 Securing the Ejector Into the PM
CISCO
LINECARD CHASSIS
1
254847
1
Screw the ejector into the PM
Step 4 Install the second PM and fill the power shelf to the required configuration.
What to Do Next
After installing the PMs, you can install the cosmetic covers. For more information, see Chapter 5, “Installing and Removing Exterior Components.”
Removing AC or DC PMs
This section describes how to remove AC or DC PMs from the Cisco CRS
Note Although there are differences between the AC and DC PMs, they are removed in the same manner.
Required Tools and Equipment
You need the following tools to perform this task:
•
•
Cisco CRS Carrier Routing System
|
| |
|