Cisco Systems OL-6256-17 manual Prerequisites

Models: OL-6256-17

1 182
Download 182 pages 23.48 Kb
Page 84
Image 84

Chapter 2 Installing and Removing Power Components

How to Install or Remove Modular Configuration Power Components

Power Up a Chassis with a Modular Configuration AC or DC Power Shelf

This section describes how to power up a chassis with a modular configuration AC or DC power shelf.

Prerequisites

Before performing this task, you must install the power shelves, wire the power shelves, install the PMs, and install the route processor (RP) card. See the “Installing a Modular Configuration Power Shelf” section on page 2-26, the “Installing AC Power Cords or DC Power Shelf Wiring” section on

page 2-35the“Installing AC or DC PMs” section on page 2-40, and the “Installing an RP, PRP, or DRP Card” section on page 4-38for more information.

Steps

To power up the chassis, perform the following steps:

Step 1 Turn the facility breaker for both power shelves (Power A and Power B) to the ON position.

Step 2 Turn the power shelf power output breakers to the ON position.

Note There is no required order in which you must turn on the power shelves.

Power Down a Chassis with a Modular Configuration AC or DC Power Shelf

This section describes how to power down a chassis with a modular configuration AC or DC power shelf.

Prerequisites

Before performing this task, you must ensure that the system software has been shut down.

Steps

To power down the chassis, perform the following steps:

Step 1 Turn the power shelf power output breakers to the OFF position.

Note There is no required order in which you must turn off the power shelves.

Step 2 Turn the facility breaker for both power shelves (Power A and Power B) to the OFF position.

Note To power down the chassis entirely, both power shelves must be disconnected to de-energize the chassis completely.

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Installation Guide

2-52

OL-6256-17

 

 

Page 84
Image 84
Cisco Systems OL-6256-17 manual Prerequisites