Contents

 

 

 

Installing an Impedance Carrier

4-16

 

 

 

 

 

 

Prerequisites

4-17

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-18

 

 

 

 

 

Steps

4-18

 

 

 

 

 

 

 

 

 

What to Do Next

4-18

 

 

 

 

 

 

 

Removing an Impedance Carrier

4-18

 

 

 

 

 

Prerequisites

4-18

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-18

 

 

 

 

 

Steps

4-19

 

 

 

 

 

 

 

 

 

What to Do Next

4-19

 

 

 

 

 

 

 

How to Install or Remove a Pillow Block

4-19

 

 

 

 

 

Installing a Pillow Block

4-19

 

 

 

 

 

 

 

Prerequisites

4-19

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-20

 

 

 

 

 

Steps

4-20

 

 

 

 

 

 

 

 

 

What to Do Next

4-21

 

 

 

 

 

 

 

Removing a Pillow Block

4-21

 

 

 

 

 

 

 

Prerequisites

4-21

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-21

 

 

 

 

 

Steps

4-21

 

 

 

 

 

 

 

 

 

What’s Next

4-22

 

 

 

 

 

 

 

 

How to Install or Remove a Switch Fabric Card

4-22

 

 

 

 

Installing a Switch Fabric Card

4-22

 

 

 

 

 

 

Prerequisites

4-23

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-24

 

 

 

 

 

Steps

4-24

 

 

 

 

 

 

 

 

 

What to Do Next

4-26

 

 

 

 

 

 

 

Removing a Switch Fabric Card

4-26

 

 

 

 

 

 

Prerequisites

4-27

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-27

 

 

 

 

 

Steps

4-27

 

 

 

 

 

 

 

 

 

What to Do Next

4-28

 

 

 

 

 

 

 

Verifying the Installation of a Switch Fabric Card 4-28

 

 

 

Understanding the Alphanumeric LEDs

4-28

 

 

 

 

Troubleshooting the Switch Fabric Card

4-28

 

 

 

 

How to Install or Remove an MSC, FP, or LSP 4-29

 

 

 

Installing an MSC, FP, or LSP

4-29

 

 

 

 

 

 

Prerequisites

4-31

 

 

 

 

 

 

 

 

Required Tools and Equipment

4-31

 

 

 

 

 

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Installation Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

viii

 

 

 

 

 

 

 

OL-6256-17

 

 

 

 

 

 

 

 

 

 

Page 8
Image 8
Cisco Systems OL-6256-17 manual Verifying the Installation of a Switch Fabric Card