Emerson Process Management 5300 manual Rigid Single Lead probe 8 mm, Bushing

Models: 5300

1 324
Download 324 pages 46.88 Kb
Page 57
Image 57

Reference Manual

00809-0100-4530, Rev BA July 2009

Rosemount 5300 Series

Rigid Single Lead probe (8 mm)

Bushing

Bushing

1.Mount the centering disc at the end of the probe.

2.Fasten the disc by inserting the split pin through the bushing and the probe.

Split pin

3. Secure the split pin.

NOTE!

The washer should not be used if the disc material is C-276.

NOTE!

Centering discs may not be used with PTFE covered probes.

A clearance distance of 1 in. (25 mm) between the probe end and the chamber bottom is recommended.

To avoid bending the probe (rigid probes), or twisting and coming into contact with the chamber wall (flexible probes), a small clearance distance between centering disk and chamber bottom is recommended. The clearance distance of 1 in. (25 mm) is selected with a dome shaped chamber bottom in mind, which may prevent the centering disk from reaching the bottom.

3-27

Page 57
Image 57
Emerson Process Management 5300 manual Rigid Single Lead probe 8 mm, Bushing