
5.Connect one end of the power cord for the new power supply into the connector on the back of the power supply; then, connect the other end of the power cord to a properly grounded electrical outlet.
Note: If the server has been turned off, you must wait approximately 3 minutes after you connect the server power cord to an electrical outlet before the
6.Make sure that the ac power LED on the top of the power supply is lit, indicating that the power supply is operating correctly. If the server is turned on, make sure that the dc power LED on the top of the power supply is lit also.
Installing redundant power supply and fans
You can install a second
To install the redundant power and cooling option, do the following:
1.Read the safety information that begins on page 5.
2.Remove the
3. | Remove the three fan air baffles | from the fan bays of the fan cage |
| assembly. |
|
4. | Install the three | in the empty bays of the fan cage assembly. |
Chapter 7. Installing optional devices and replacing customer replaceable units 177