Commissioning (software)

4

4.1Overview of commissioning

Prerequisites

Prerequisites for commissioning the SIMOTION D410:

The system has been connected and wired.

The SIMOTION D410 is switched on and started up (STOP state).

SIMOTION SCOUT (with integrated STARTER) has been installed and started on the programming device / PC.

Communication between the SIMOTION D410 and the programming device / PC is configured.

You have created a project and installed a SIMOTION D410 in the project.

NOTICE

For the SIMOTION D410, a reset of the drive must not be set using the expert list of the control unit in the p972 parameter (drive unit reset). This causes SIMOTION D410 malfunction, the RDY, RUN/STOP and SF/BF LEDs glow red. In this fault situation, the SIMOTION D410 must be switched off and on again.

Commissioning steps

This chapter describes the steps in configuring the plant and testing the configured stand- alone drive and axis. The steps in commissioning are listed below in the order as recommended:

1.Configuring SINAMICS Integrated

The integrated drive SINAMICS Integrated can be configured in offline or online mode:

Offline configuration

All components and their order number must be known for the offline configuration.

Online configuration

The configuration in online mode allows you to upload all information of the connected DRIVE-CLiQ components to your user project.

D410

61

Commissioning Manual, 08/2008 Edition

Page 61
Image 61
Siemens D410 appendix Overview of commissioning, Commissioning steps