Commissioning (software)

4.2Configuring the system in offline mode

2.Creating an axis

3.Using the digital I/O

4.Optionally, use TMx, DMC20 or other encoders

5.Testing the configured drive

6.Testing the configured axis

Observe the corresponding references.

4.2Configuring the system in offline mode

4.2.1Overview

Prerequisites for offline configuration

All components and their order number must be known for the offline configuration.

You created a project in SIMOTION SCOUT and added a SIMOTION D410 to the project.

You configured the communication between the programming device / PC and SIMOTION D410.

Procedure

Steps involved in offline configuring:

Calling the Drive Wizard

Configuring the components

Aligning the HW Config

Downloading the project to SIMOTION D410

Note

You can configure all available terminal modules such as TM15 in the course of the offline configuration, for example.

62

D410

Commissioning Manual, 08/2008 Edition

Page 62
Image 62
Siemens D410 appendix Configuring the system in offline mode, Overview, Prerequisites for offline configuration