Sensor Test (high capacity output stacker)

1.Select Sensor Test from OUTPUT BIN TESTS.

2.Select Output Bin x (x=number of the output option to be tested).

The following screen is displayed:

HC Bin x TP=OPpassThru=Open Full=Open NearFull=Open

TP—High-capacity top position sensor

passThru—High-capacity pass thru sensor

Full—High-capacity bin full sensor (lower part of dual sensor)

NearFull—High-capacity bin near full sensor (upper part of dual sensor)

3.Manually actuate each of the sensors of the high-capacity stacker, and the display by each sensor toggles from Open to Closed.

4.Press Back ( ) or Stop ( ) to exit the test.

Sensor Tests (5-bin mailbox)

1.Select Sensor Tests from OUTPUT BIN TESTS.

2.Select Output Bin x (x=number of the output option to be tested). The following screen is displayed:

Output Bin x

P1=OP P2=OP L=NL

passThru—5-bin mailbox pass thru sensor shows Open or Closed

mailboxEmpty—5-bin mailbox empty sensor shows Normal for a normal level, NearFull for nearly full, and Full for full.

3.Manually actuate each of the sensors of the 5-bin mailbox,. The pass thru sensor will indicate Open or Closed and the empty sensor (mailboxEmpty) indicates Normal, NearFull, or Full.

4.Press Back () or Stop () to exit the test.

Diverter Test

This test verifies the functioning of each of the 5-bin mailbox output media diverters. If more than one 5-bin mailbox is installed, all installed diverters or tested.

To run the Diverter Test, select Diverter Test from the OUTPUT BIN TESTS. The test runs once and stops.

3-16Service Manual

Page 180
Image 180
Toshiba e-STUDIO500P manual Sensor Test high capacity output stacker, Sensor Tests 5-bin mailbox, Diverter Test