INSTALLATION
INSTALLATION
Installation of a System 25 requires the completion of a number of basic steps, similar to those required to install any customer switching system. Assuming that the building (station) wiring is already in place, the recommended sequence of steps for installation of the system is as follows:
1.Preinstallation Requirements
2.Install System Cabinets
3.Power Up and Initialize System
4.Install
5.Install Modular Bulk Power Supply (Optional)
6.Connect Cabinets to Trunk Access Equipment
7. Connect Cabinets to Station Interconnect Panel (SIP)
8.Install Customer’s Peripheral Equipment
9.Install Terminals
10.Install Auxiliary Equipment
11.Test System
Note: Step 4 can be done before Steps 2 and 3 if the cross- connect equipment is delivered before the cabinets.