INSTALLATION

Attach cable labels to the two octopus cable 25-pair connectors and flag-type tie wrap.

Attach octopus cables to the 853B adapter

Run the cables to the 50A Fanning Strip.

Plug the cable ends into the appropriate adapters, and complete the Voice and Data Station Records Form.

November 1995

2-74a

Page 99
Image 99
ADTRAN 25 manual 74a