
INSTALLATION
Building Wiring
Building (station) wiring (must be 24 AWG or heavier) from voice and data terminals to the equipment location should already be in place. System 25 wiring requires that
In unusual circumstances where the 617A Panels are not used and some other
All examples and instructions in this manual assume that a SIP is used.
The station wiring terminations in the equipment area should have been labeled to indicate the room location and jack number of the other end of the line. When SIP connections are made, the connection information should be entered on the Voice and Data Station Records Form (see Install Equipment Room Station Cabling in this part for details).