| INSTALLATION |
Initialize System |
|
|
Instructions for initializing the system | (based on the completed | |
implementation forms) are provided in | the Administration Manual | |
|
| |
Note: Before trunks using DS1 Signaling are administered, all link level parameters such as signaling and framing and all link level alarms must be cleared. If this is not possible, PBXs at each end will not work. If this condition exists, clear a maintenance busy condition that exists at each end.
INSTALL CROSS-CONNECT EQUIPMENT
Before starting, familiarize yourself with the following equipment described in
●Trunk Access Equipment (TAE)
700
10B Emergency Transfer Units
●Station Interconnect Panel (SIP)
617A Panels
858A or Z210A2 Adapters
50A Fanning Strips.