INSTALLATION
11. Connect the other end of the modular cord to a 355AF Adapter.
12. Connect an M7U-87 Cord to the 355AF Adapter.
13. Connect the other end of the M7U-87 Cord to the RS-232C jack on a
Z3A4 ADU.
14. Connect the ADU to a 400B2 Adapter with a D8W-87 cord.
15. Connect the 400B2 Adapter to a 2012D Supplementary Power Unit
as shown in Figure 2-47.
16.
Plug the 400B2 Adapter into a 2210A2 Adapter on the SIP.
17. Using an octopus cable, connect the other side of the Z210A2
Adapter to the supporting TN726 CP.
2-107