Issue 2 December 1995 xiii
About This Docum ent
Chapter 4, "Hardware Installation", describes the installation of the SID,
cables to the switch, and cables to the INTUITY syst em. This chapter only
contains information for installing the hardware components req uired f or
the integration.
Chapter 5, "Installing SID Software on the INTUITY System", contains
instructions for installing the INTUITY syste m software required to
integrate with the NEAX 2400 switch.
Chapter 6, "Administering the INTUITY System for the NEAX Int egration",
contains instructions for administering an INTUIT Y system to integrate with
the switch. The chapter includes instructions for setting the message
waiting lamp param eters, setting the switch interface parameters, and
associating the application and the swit c h interface.
Chapter 7, "NEAX 2400 Switch Administration", contains information and
instructions for administering a NEAX 2400 MCI switch to work with an
INTUITY system.
Chapter 8, "Switch Integration Device Administration", contains information
and instructions for administering the SID to work with the INTUITY
system.
Chapter 9, "Acceptance Tests", provides instructions for the switch
administration you must perform be fore yo u c a n c onti nue wit h the
acceptance tests.
Chapter 10, "Cut-to-Ser vice", provides instructions for the switch
administration you must perform bef ore you c a n c onti nue wit h
cut-to-service.
Appendix A, "Troubleshooting and Error Logs", provides troubleshooting
information to help you isolate and correct integration problems.
Appendix B, "Using Views During Integration", provides information about
the SID real-time views of the integration process.
Appendix C, "Switch Ad ministration for INTUITY Lodgin g", provides switch
administration procedures if you have INTUITY Lodg ing.
The docume nt also includes a list of co mm on a bbreviations, a glossary, and an
index.