Quantum 3.5.2 manual Scheduler Report Screen StorNext User’s Guide 294

Models: 3.5.2

1 439
Download 439 pages 43.8 Kb
Page 315
Image 315

Chapter 12 StorNext Reports

The Scheduler Information Report

Window: If StorNext was down at the time of the scheduled event and is restarted during the window time period, the event is launched; otherwise it is skipped until the next scheduled time

Last Run: The time the schedule was last run

Use the following procedure to run the Scheduler report.

1Choose Scheduler from the Reports menu. The Scheduler Report screen appears.

Figure 218 Scheduler Report

Screen

StorNext User’s Guide

294

Page 315
Image 315
Quantum 3.5.2 manual Scheduler Report Screen StorNext User’s Guide 294