Chapter 18 DLPs F300 to F399

DLP- F391 Install Alarm Wires on the CAP/CAP2

Step 12 Return to your originating procedure (NTP).

DLP-F391 Install Alarm Wires on the CAP/CAP2

Purpose

This task installs the alarm wires on the customer access panel

 

(CAP/CAP2).

Tools/Equipment

Wire-wrap tool (suitable for #22 to #28 AWG alarm wires)

 

#22 to #28 AWG wires

 

Audible alarm cable with DB-15 connector

Prerequisite Procedures

NTP-F113 Install the Bay Power and Ground, page 1-10

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

None

Step 1 Wrap the alarm wires on the appropriate wire-wrap pins according to local site practice. Figure 18-27shows the backplane of the ONS 15600 SDH shelf and the location of the alarm pin field on the CAP/CAP2.

 