Chapter 18 DLPs F300 to F399

DLP- F343 Provision an STM-N Circuit Route

DLP-F343 Provision an STM-N Circuit Route

Purpose

This task provisions the circuit route for manually routed STM-N circuits.

Tools/Equipment

None

Prerequisite Procedures

DLP-F181 Log into CTC, page 16-34

 

The Circuit Creation Wizard must be open.

Required/As Needed

As needed

Onsite/Remote

Onsite or remote

Security Level

Provisioning or higher

Step 1 In the Circuit Creation wizard in the Route Review/Edit area, click the source node icon if it is not already selected.

Step 2 Starting with a span on the source node, click the arrow of the span you want the circuit to travel. To reverse the direction of the arrow, click the arrow twice.

The arrow turns white. In the Selected Span area, the From and To fields provide span information. The source VC appears.

Step 3 If you want to change the source VC, adjust the Source VC field; otherwise, continue with Step 4. Step 4 Click Add Span. The span is added to the Included Spans list and the span arrow turns blue.

Step 5 Repeat Steps 2 through 4 until the circuit is provisioned from the source to the destination node through all intermediary nodes. If Fully Protected Path is checked in the Circuit Routing Preferences area, you must:

Add two spans for all SNCP or unprotected portions of the circuit route from the source to the destination.

Add one span for all MS-SPRing or 1+1 portions of route from the source to the destination.

Add primary spans for MS-SPRing-DRI from the source to the destination through the primary nodes, and then add spans through the secondary nodes as an alternative route. The circuit map shows all span types: unprotected, MS-SPRing, and PCA. PCA spans can only be chosen as part of the secondary path.

Step 6 Return to your originating procedure (NTP).

DLP-F344 Initiate an MS-SPRing Manual Ring Switch

Purpose

This task performs an MS-SPRing Manual ring switch. A Manual ring

 

switch will switch traffic off a span if there is no higher priority switch

 

(Force or lock out) and no signal degrade (SD) or signal failure (SF)

 

conditions.

Tools/Equipment

None

Prerequisite Procedures

DLP-F181 Log into CTC, page 16-34

Required/As Needed

As needed

 

 

Cisco ONS 15600 SDH Procedure Guide, R8.0

 

 

 

 

 

 

October 2007

 

 

18-47

 

 

 

 

 

Page 47
Image 47
Cisco Systems ONS 15600 SDH DLP-F343 Provision an STM-N Circuit Route, DLP-F344 Initiate an MS-SPRing Manual Ring Switch