Chapter 18 DLPs F300 to F399

DLP- F349 Install Fiber-Optic Cables for MS-SPRing Configurations

Table 18-3

ONS 15600 SDH Circuit Status (continued)

 

 

 

Status

 

Definition/Activity

 

 

PENDING_MERGE

Any new circuits created to represent an alternate path in a

 

 

topology upgrade are set to this status to indicate that it is a

 

 

temporary circuit. These circuits can be deleted if a topology

 

 

upgrade fails. For more information about topology

 

 

upgrades, refer to the Cisco ONS 15600 SDH Reference

 

 

Manual.

 

 

DROP_PENDING

A circuit is set to this status when a new circuit drop is being

 

 

added.

 

 

 

Source—The circuit source in the format: node/slot/port/STS. If an ASAP PPM port is the circuit source, the port format is PIM-PPM-port, where PIM and PPM values are 1 through 4 (for example, p1-1-1). PPMs have only one port.

Destination—The circuit destination in the format: node/slot/port/STS. If an ASAP PPM port is the circuit destination, the port format is PIM-PPM-port, where PIM and PPM values are 1 through 4 (for example, p1-1-1). PPMs have only one port.

# of VLANS—(Future use) The number of VLANs used by an Ethernet circuit.

# of Spans—The number of internode links that constitute the circuit. Right-clicking the column shows a shortcut menu from which you can choose Span Details to show or hide circuit span detail.

State—The circuit service state, which is an aggregate of its cross-connects. The service states are Unlocked, Locked, or Locked-partial. For more information about circuit service states, refer to the “Administrative and Service States” appendix of the Cisco ONS 15600 SDH Reference Manual.

Unlocked—All cross-connects are in service and operational.

Locked—All cross-connects are Locked-enabled,maintenance or Locked-enabled,disabled.

Locked-partial—At least one cross-connect is Unlocked-enabled and others are in the Locked-enabled,maintenance and/or Locked-enabled,disabled service states.

Step 3 Return to your originating procedure (NTP).

DLP-F349 Install Fiber-Optic Cables for MS-SPRing Configurations

Purpose

This task installs the fiber-optics to the east and west MS-SPRing ports at

 

each node. See Chapter 5, “Turn Up a Network” to provision and test

 

MS-SPRing configurations.

Tools/Equipment

Fiber-optic cables

Prerequisite Procedures

NTP-F119 Install the STM-N Cards, page 2-4

 

NTP-F231 Clean Fiber Connectors and Adapters, page 14-16

Required/As Needed

As needed

Onsite/Remote

Onsite

Security Level

None

 

Cisco ONS 15600 SDH Procedure Guide, R8.0

18-54

October 2007

Page 54
Image 54
Cisco Systems ONS 15600 SDH manual Pendingmerge, Droppending, 18-54