Epson Research and Development

Page 9

Vancouver Design Center

 

 

 

3 Installation and Configuration

The S5U13705B00C is designed to support as many platforms as possible. The S5U13705B00C incorporates a DIP switch and seven jumpers which allow both evaluation board and S1D13705 LCD controller to be configured for a specified evaluation platform.

3.1 Configuration DIP Switches

The S1D13705 has configuration inputs (CNF[3:0]) and BS# input, which are read on the rising edge of RESET#. In order to configure the S1D13705 for multiple Host Bus Inter- faces a six-position DIP switch (SW1) is required. The following figure shows the location of DIP switch SW1 on the S5U13705B00C.

DIP Switch - SW1

Figure 3-1: Configuration DIP Switch (SW1) Location

S5U13705B00C Rev. 2.0 Evaluation Board User Manual

S1D13705

Issue Date: 2002/09/16

X27A-G-014-02

Page 321
Image 321
Epson S1D13705 technical manual Configuration DIP Switches, Configuration DIP Switch SW1 Location