
Deploying WX switches from a Network Plan to the Network 339
Deploying WX | To deploy the WX switches configured in a network plan, select |
switches from a | Manage > Deploy from the toolbar in the main 3WXM window. The |
Network Plan to | Deploy Configurations dialog box is displayed. |
the Network | This dialog box is also accessible from the Managed Devices tab, and is |
| |
| displayed when you click Deploy on that tab. |
To deploy network | To deploy network plan changes to the network, use the following |
plan changes to the | procedure. |
network |
|
1Select one or more WX switches.
To select multiple WX switches, press Shift (for contiguous WX switches) or Control (for noncontiguous WX switches) while clicking.
2In the Local Changes group box, click Deploy. The Deploy Configurations dialog box appears.
The dialog lists the WX switches that have configuration changes.
To deploy WX To deploy WX switches from a network plan to the network, use the switches from a following procedure.
network plan to the network
1Select the WX switches to which you want to deploy the changes.
To select more than one WX, click Shift while clicking to select contiguous items, or click Ctrl while clicking to select noncontiguous items.
2Click Deploy Now.
The deployment status for each affected WX is shown on the History tab at the bottom of the dialog box.
If errors occur, click Selected Errors to view the errors. If there are errors, fix them and verify the changes before trying to deploy again. (You can use the Verification tab to fix the errors. See “Verifying Configuration Information” on page 327.)
If the deploy is successful, 3WXM also instructs the WX switch to save the changes in its configuration file.
3Click Close to return to the Managed Devices tab.