Omron CS1W-DRM21, CJ1W-DRM21 2 I/O Response Time, Refresh Time, Maximum I/O Response Time

Models: CJ1W-DRM21 CS1W-DRM21

1 274
Download 274 pages 23.02 Kb
Page 202
Image 202

Remote I/O Communications Characteristics

Section 8-1

Slaves with More Than 8 Bytes of Input or Out put

Refresh Time

TRT = TOH + TBYTE-IN BIN + TBYTE-OUT BOUT [ms]

 

TOH :

Protocol overhead

 

TBYTE-IN :

The input byte transmission time

 

BIN :

The number of input words

 

TBYTE-OUT :

The output byte transmission time

 

BOUT :

The number of output words

 

Baud rate

 

TOH

TBYTE-IN

 

TBYTE-OUT

500 kbps

 

0.306 ms

0.040 ms

 

0.036 ms

 

 

 

 

 

 

250 kbps

 

0.542 ms

0.073 ms

 

0.069 ms

 

 

 

 

 

 

125 kbps

 

1.014 ms

0.139 ms

 

0.135 ms

 

 

 

 

 

 

For Input Slaves take BOUT to be 0, and for Output Slaves take BIN to be 0.

The refresh time is the time required for I/O data to be exchanged between the PC’s CPU Unit and the DeviceNet Unit. The CPU Unit’s cycle time is increased when a DeviceNet Unit is mounted, as shown below.

Processing item

Processing time

 

 

I/O refresh

DeviceNet Unit I/O refreshing time (ms)

 

0.7 + 0.001 the number of words refreshed (See note 1.)

 

 

Note 1. The number of words refreshed is the total number of words in the I/O area that are used by the Slaves, including any unused words between words actually used by the Slaves. For example, if there are only two Input Slaves with node addresses 1 and 5, the 5 input words for nodes 1 through 5 would be refreshed even though the input words for nodes 2, 3, and 4 are unused.

2.If message communications are being performed, just add the number of words used in message communications to the above number of words for whenever messages are being processed.

3.When the message communications are performed, an event execution time must be added to the PC cycle time.

4.For details about refresh time or PC cycle time, refer to operation manual of the PC.

8-1-2 I/O Response Time

Maximum I/O Response Time

Communications Cycle The maximum I/O response time will be as shown below if the DeviceNet Unit

Time PC Cycle Time takes in data immediately after I/O refreshing and if the communications cycle time is longer than the PC cycle time.

PC

Instruction

Instruction

Instruction

execution

execution

execution

 

ON input data

Transfers to the

Takes into the

 

notice delayed

shared RAM

 

 

 

when PC scan is PC's internal

 

 

completed.

memory.

 

Communications cycle

Slave

192

Page 202
Image 202
Omron CS1W-DRM21, CJ1W-DRM21 operation manual 2 I/O Response Time, Refresh Time, Maximum I/O Response Time