3-2 Installation

Install the NT600S to the operation panel and connect the power to the NT600S as described below.

3-2-1 Installation to the Operation Panel Caution Select a proper location referring to Appendix D Installation Environment (page 262).

Always switch OFF the power before assembling equipment or connecting cables. Otherwise you could sustain an electric shock or equipment could be damaged.

3-2-1 Installation to the Operation Panel

The NT600S can be flush mounted to an operation panel.

Manual background Caution

Note

Use the panel fittings and tools included in the product package and follow the pro- cedure below.

During work at the panel, take care to ensure that no metal scraps enter the unit. Otherwise, the product may malfunction.

￿The thickness of applicable operation panel is 1.6 mm to 4.8 mm.

All fittings must be tightened uniformly to a torque of 0.5 to 0.6 N￿m in order to ensure water- and dust- resistance. The panel must not be soiled or warped, and must be able to support an installation that will remain secure and strong.

(1)Open a hole, shown below, in the panel and install the NT600S from the front side of the panel.

+0.5 mm

180.5 0 mm

263.5 +0.5 mm

0 mm

(2)Attach the panel fittings at four positions for the upper/lower sides and at two positions for the right and left sides, shown below, on the rear side of the NT600S.

Fit the hook of the fitting in the square hole in the body and tighten the screw with a Phillips head screwdriver while lightly pulling the fitting.

￿￿

Page 41
Image 41
Omron V022-E3-1 operation manual 3-2Installation, 3-2-1Installation to the Operation Panel, Section