Chapter 4—Metering Capabilities

63230-300-212

Demand Readings

April 2001

 

 

Calculation updates

 

Demand value is

 

every 15 or

 

 

 

 

 

 

 

 

 

 

the average for

60 seconds

 

 

 

15-minute interval

 

the last completed

 

 

 

 

 

 

 

 

 

 

 

interval

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15 30 45 60 . . .

Time

(sec)

Sliding Block

 

Calculation updates

 

 

 

Demand value

 

 

 

 

 

 

 

 

is the average

 

at the end of the interval

 

 

 

 

 

 

 

for last

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

completed

 

 

 

 

 

 

 

 

interval

 

15-minute interval

 

 

15-minute interval

 

 

15-min

 

 

 

 

 

 

 

 

 

Time

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

30

 

45

 

 

 

(min)

Fixed Block

 

Calculation updates at

 

 

 

Demand value

 

the end of the subinterval (5 min.)

 

 

is the average

 

 

 

 

 

 

 

for last

 

 

15-minute interval

 

 

 

completed

 

 

 

 

 

interval

 

 

 

 

 

 

 

Time

15

20

25

30

35

40

45

(min)

 

 

 

Rolling Block

 

 

 

Figure 4–3: Block Interval Demand Examples

58

© 2001 Schneider Electric All Rights Reserved

Page 70
Image 70
Schneider Electric 4000 manual Block Interval Demand Examples