9-30 Agilent E5250A User’s Guide, Edition 9
Executing Sample Programs
HCI Measurement Program
After each interim characterization, the fractional change in a parameter versus
the stress time is displayed on GRAPHICS page of the 4155/4156 as shown in
Figure 9-8.
After testing, the test result data is saved to the diskette in the computer's disk
drive, and the following message is displayed.
"HCI Degradation Test is Completed!!"
Figure 9-6 Example of Ib-Vgs Measurement Results