Executing Sample Programs

Vth and Capacitance Measurement Program

Table 9-2

Vth and Capacitance Measurement Flow

 

 

 

 

 

Step

 

Description

 

 

 

 

1

Initializes the Instruments:

 

 

1.

Resets the 4155/4156.

 

 

2.

Resets the 4284A.

 

 

3.

Resets and initializes the E5250A.

 

 

 

Configuration Mode: NORMAL

 

 

 

Bias Mode: OFF

 

 

 

Connection Rule: Single

 

 

 

Connection Sequence: BBM

 

 

 

 

2

Measures Vth of MOSFET:

 

 

1.

Loads the 4155/4156 setup file for Vth measurement. And sets up the

 

 

 

4155/4156 measurement conditions.

 

 

2.

Creates connection channels in the E5250A for Vth measurement.

 

 

3.

Measures Vth of MOSFET.

 

 

4.

Disconnects the connection channels in the E5250A.

 

 

5.

Judges pass or fail.

 

 

6.

Displays result and measurement data on computer's screen.

 

 

7.

Resets instrument.

 

 

 

 

3

Measures Capacitance:

 

 

1.

Sets up the 4284A measurement conditions.

 

 

2.

Creates connection channels in the E5250A for C measurement.

 

 

3.

Measures capacitance.

 

 

4.

Disconnects the connection channels in the E5250A.

 

 

5.

Compensates the measurement data.

 

 

6.

Judges pass or fail.

 

 

7.

Displays result and measurement data on computer's screen.

 

 

8.

Resets instrument.

 

 

 

 

4

Resets all instruments.

 

 

 

 

 

 

 

 

9-4

Agilent E5250A User’s Guide, Edition 9

Page 260
Image 260
Agilent Technologies Agilent E5250A manual Vth and Capacitance Measurement Flow, Step Description