Executing Sample Programs

HCI Measurement Program

Setting up the Measurement Environment

Before executing the program, you need to set up the measurement environment as follows:

1.Prepare the equipment shown in Table 9-6, which lists the required equipment to execute the program.

2.For each E5255A, make internal connections, and set the DIP switches. Refer to Figure 9-3.

Three E5255As are used, which are installed in Slot1, Slot2, and Slot3 of the E5250A. The internal connections of the three E5255As are almost the same, except for the following:

IVin1 internal connection (1 in Figure 9-3) for each E5255A: for Slot1: IVin1 to SMU1

for Slot2: IVin1 to SMU3

for Slot3: IVin1 to SMU4

DIP SW settings in each slot are different as shown in Figure 9-3. But within each E5255A, SW1/SW2/SW3 settings are the same.

3.Connect all equipment and devices as shown in Figure 9-4 and Table 9-7. Refer to Chapter 4 for the details of the connection from the E5250A output to Device Under Test (DUT).

9-24

Agilent E5250A User’s Guide, Edition 9

Page 280
Image 280