Controlling the E5250A

 

 

 

 

Switch Control Basics

 

 

 

 

Connection Sequence

 

 

 

 

This is only for cards that are set to the Single Route connection rule. Refer to

NOTE

 

“Connection Rule” on page 5-9.

 

 

 

Connection sequence specifies the open/close sequence of the relays when changing

 

from an existing connection to a new connection. You can specify the connection

 

sequence by using the [:ROUTe]:CONNection:SEQuence command described in

 

Chapter 7.

 

 

 

 

You can select one of the three connection sequences shown in Table 5-3 for each

 

card installed in the E5250A.

 

 

 

 

When an existing connection is changed to a new connection, the relays are

 

opened/closed as follows:

 

 

 

Table 5-3

Connection Sequence

 

 

 

 

 

 

 

 

 

 

 

 

Connection

 

 

Relay Operation

 

 

 

Sequence

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Break Before Make

 

1.

Disconnect previous route.

 

 

 

 

 

2.

Wait for relays to open.

 

 

 

 

 

3.

Connect new route.

 

 

 

 

 

 

 

 

 

 

Make Before Break

 

1.

Connect new route.

 

 

 

 

 

2.

Wait for relays to close.

 

 

 

 

 

3.

Disconnect previous route.

 

 

 

 

 

 

 

 

 

 

No Sequence

 

1.

Disconnect previous route.

 

 

 

 

 

2.

Connect new route.

 

 

 

 

 

 

 

 

5-10

Agilent E5250A User’s Guide, Edition 9

Page 104
Image 104
Agilent Technologies Agilent E5250A manual Connection Sequence Relay Operation