3.Tighten the two captive screws at the bottom of the power supply box. See the figure below.
AF001238
Figure 80. Tightening the Internal Power Supply Box Screws
4.Tighten the two screws on the exterior of the system. One screw is on each side of the system, as shown below.
AF001237
Figure 81. Tightening the External Power Supply Box Screws
5.Connect the CPU1 / CPU2 MVR cable from the main board. See the figure below to locate the MVR cable connection.
Intel® Server System SR9000MK4U Product Guide | 81 |