8 Operational Description

This chapter describes the working circuit and control of Air to Water Heat Pump about the following operations.

 

Item

Page

 

 

 

 

Basic Operation

 

 

1)Operation control

 

8-1

2)Hot water supply operation

36-38

 

3)Heating operation

 

 

4)Cooling operation

 

 

 

 

 

Operation Mode and Control Method

 

 

1)Hot water supply operation

 

 

2)Heating operation

 

 

3)Cooling operation

 

 

4)Simultaneous operation of “hot water supply" and "heating”

 

 

5)Simultaneous operation of “how water supply" and "cooling”

 

8-2

6)Boiler-assisted heating operation

39-47

 

7)HOT WATER BOOST operation

 

 

8)Anti bacteria

 

 

9)Night setback operation

 

 

10) FROST PROTECTION operation

 

 

11) AUTO operation

 

 

12) Nighttime low-noise operation

 

 

 

 

 

Hydro Unit Control

 

 

1)Capacity control (compressor, high-temperature release, low-temperature release)

 

 

2)Heater control

 

 

3)Circulation pump control

 

8-3

4)Flow switch control

48-56

 

5)Mixing valve control (2-temperature heating control)

 

 

6)Q-H characteristics of hydro unit

 

 

7)Automatic restart control

 

 

8)Piping anti-freezing control

 

 

 

 

 

Outdoor Unit Control

 

 

1)PMV (Electronic control valve) control

 

 

2)Outlet temperature release control

 

 

3)Current release control

 

8-4

4)Current releases shift control

57-63

5)Outdoor fan control

 

 

 

6)Defrosting control

 

 

7)Winding heating control

 

 

8)Continued operation prevention under short-circuit conditions

 

 

9)Overcurrent protection control

 

 

 

 

35

Page 36
Image 36
Toshiba HWS-1501CSHM3-E(-UK), HWS-802XWHT6-E, HWS-802H-E, HWS-802XWHM3-E, HWS-3001CSHM3-E(-UK) Operational Description