3. Trial Operation

<Procedure>

A trial operation is available with an actual operation in progress or stopped. A trial operation is available in any of the hot water supply, heating, or cooling mode. The compressor starts according to the trial operation frequency. A trial operation automatically stops after 30 minutes at the longest if not stopped with the remote controller.

1 Press the remote controller TEST button for 4 seconds or longer to display "TEST" on the LCD screen.

<For hot water supply trial operation>

2 Press the HOT WATER button, and a hot water supply operation starts after 3 minutes. (See display )

(The pump immediately starts.)

3 Pressing the HOT WATER button again stops the hot water supply operation.

 

 

2, 3

1, 4

<For heating trial operation>

1 Press the ZONE1,2 button, and a heating operation starts after 3 minutes. (See display )

(The pump immediately starts.)

2 Pressing the ZONE1,2 button again stops the heating operation.

1, 4 2, 3

<For cooling trial operation>

2 Press the ZONE1,2 button and then OPERATE MODE , and a cooling operation starts after 3 minutes.

(The pump immediately starts.) (See display )

3 Pressing the ZONE1,2 button again stops the cooling operation.

4 Press TEST

on the remote controller to exit the trial

1, 4 3

2

 

 

operation mode.

109

Page 110
Image 110
Toshiba HWS-802XWHT6-E, HWS-802H-E, HWS-802XWHM3-E, HWS-3001CSHM3-E(-UK), HWS-2101CSHM3-E(-UK) Trial Operation, 109