Toshiba HWS-3001CSHM3-E(-UK), HWS-802XWHT6-E Work procedure, Remarks, Pump, fixing, board

Models: HWS-1402XWHT9-E HWS-1402XWHM3-E HWS-1402XWHT6-E HWS-1501CSHM3-E(-UK) HWS-1402H-E HWS-2101CSHM3-E(-UK) HWS-3001CSHM3-E(-UK) HWS-802XWHM3-E HWS-802H-E HWS-802XWHT6-E

1 168
Download 168 pages 43.83 Kb
Page 133
Image 133
Pump

No.

Exchange parts name

 

Work procedure

Remarks

 

 

 

 

 

 

12

Pump

 

 

 

 

 

To replace a water circuit part, first close the water

 

 

 

 

 

 

 

 

 

 

supply source valve and the valve of water pipe

 

 

 

 

 

connected to the hydro unit.

 

 

 

 

 

 

 

 

 

 

1. How to remove

 

 

 

 

1)Perform the step 1-1, step 5, 6, and 10.

 

 

 

 

2)Remove the fixed screws of the pump fixing board.

 

 

 

 

(ST1T Ø4 × 8, 2 screws)

Pump

 

 

 

3)Remove the 2 nuts of the heater connection and the

 

 

 

lower side of the pump.

fixing

 

 

 

board

 

 

 

4)Remove the pump fixing board.

 

 

 

 

 

 

 

(ST3T Ø6 × 16, 2 screws)

 

 

 

 

5)Remove the nut of the upper part of the pump.

 

2.How to attach

The pump connection uses a liquid packing for water seal. When replacing the pump, use a packing which was slathered with the liquid gasket.

Part code

Service parts

 

 

 

Nut

37595721

Packing

 

 

 

37595722

Liquid gasket

 

 

 

 

1)Attach a new pump in the reverse order of the removal.

After the pump replacement repair, open the water supply source valve and water piping valve to pass water through the hydro unit, and check that the pump connection has no water leakage.

PumpNut

Pump fixing board

132

Page 133
Image 133
Toshiba HWS-3001CSHM3-E(-UK), HWS-802XWHT6-E, HWS-802H-E Work procedure, Remarks, PumpNut Pump fixing board