Item

 

 

Operation flow and applicable data, etc.

 

 

 

 

 

 

8-2.

5) Simultaneous operations of "hot water supply" and "cooling"

Operation

For simultaneous operations of "hot water supply" and "cooling", basically cooling runs by a heat pump operation, and

Mode and

hot water supply by a heater operation.

 

 

Control Method

 

 

 

 

 

 

 

 

Hot water supply side

Cooling side

 

 

 

 

 

 

 

 

 

Normal

Heater *

Heat pump *

 

 

 

 

 

 

 

*Note that after a "cooling" heat pump operation is selected, if the thermostat off status continues for 10 minutes and TTW < 38°C is met, the operation switches to a hot water supply operation.

 

Hot water supply side

Cooling side

 

 

 

Cooling

 

 

thermostat off

Heat pump

Stop

10 min. passed

 

 

 

 

 

When TTW 45°C (FC: changeable) is met, the operation returns to the normal mode.

6) Boiler-assisted heating operation

This operation is enabled when DPSW13_2 is ON (A boiler exists).

I zone Heat pump operation

A heat pump operation is usually performed.

J zone Heat pump operation + Boiler operation *1

A heat pump + boiler operations (*2) are performed, and a heater operation is performed in the Hot water supply side.

TO

I zone

Heat pump operation

E

J zone

Heat pump boiler operation

*1: In J zone, the hydro unit setting has a priority, and when the set temperature is reached, the boiler output also becomes OFF.

Setting FC_3E to "1" makes the boiler has a priority, and even if the hydro unit set temperature is reached, the boiler output remains "ON".

*2: The boiler operation only gives boiler instruction from the hydro unit through the option board.

Related FC

FC No.

Setting item

Default

Setting available range

 

 

 

 

23

Heat pump only / Simultaneous operation switching TO

-10

-20-20°C

 

temperature (E)

 

 

 

 

 

 

3E

Hydro unit setting / Boiler set temperature priority switching

0: Priority on

1: Priority on boiler setting

 

 

hydro unit

 

 

 

setting

 

 

 

 

 

42

Page 43
Image 43
Toshiba HWS-3001CSHM3-E(-UK), HWS-802XWHT6-E, HWS-802H-E Simultaneous operations of hot water supply and cooling