No.

Exchange parts

Work procedure

 

 

 

 

 

Remarks

name

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 Electric parts

1. Control board

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

replacement

1)Perform the step 1-1.

 

Control board

 

Fan motor (upper)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compressor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

case

 

 

 

 

 

Reactor lead

 

 

 

 

WARNING

thermostat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For 1 minute after the power is turned off, do not

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

disassemble the inverter to prevent an electric

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

shock.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2)Remove the connector connected to the control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compressor lead

 

 

 

 

(Hydro power source, temperature sensor, electric

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

control valve coil, 4-way valve coil, compressor

 

Fan motor (lower)

 

 

 

 

 

Ground wire

 

 

 

case thermostat, fan motor)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temperature

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* Remove the connector by releasing the lock in the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sensor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

housing.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3)Remove the lead cable connected to the control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

board.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Compressor lead U: CN200 Red

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V: CN201 White

 

 

 

 

 

 

 

 

 

 

4-way valve coil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W: CN202 Black

Motorized control coil

 

Indoor power source

 

 

 

 

Reactor lead CN05 White

 

 

 

 

 

 

 

 

 

Screw for fixing

 

 

Screw for fixing element

 

 

 

 

CN06 White Relay connector

board

 

(9 positions)

 

 

4)Remove the ground wire of the control board. (Truss B tight screw Ø4 × 6, 1 screw)

5)Remove the fixed screws of the control board. (Collar screw for fixing element Ø3 × 16, 9 screws, Pan S-tight screw for fixing the board Ø3 × 20, 1 screw)

6)Remove the control board.

 

 

 

 

 

(Supporter 5 positions)

 

 

 

 

 

Note) Removing the control board may be difficult

 

 

 

 

 

 

 

Insulating

 

Hear release

due to the heat release grease for the heat

 

 

 

Control board

 

sheet

 

grease

sink.

 

 

 

 

 

 

 

7)Attach a new control board.

Note) • Be careful for not taking the compressor lead V: CN201 White for the reactor lead CN05 or 06 White.

(The compressor lead has a transparent sleeve at its ring terminal. The reactor lead ring terminal does not have sleeve.)

Be sure to attach the insulating sheet. (Applying beforehand a bit of heat release grease to the back side of the insulating sheet can easily paste the sheet to the heat sink.)

148

Page 149
Image 149
Toshiba HWS-1402XWHT9-E, HWS-802XWHT6-E, HWS-802H-E, HWS-802XWHM3-E 148, Case thermostat, fan motor, Reactor lead CN05 White