Toshiba HWS-1402XWHT6-E, HWS-802XWHT6-E, HWS-802H-E, HWS-802XWHM3-E, HWS-3001CSHM3-E(-UK) Hydro Unit

Models: HWS-1402XWHT9-E HWS-1402XWHM3-E HWS-1402XWHT6-E HWS-1501CSHM3-E(-UK) HWS-1402H-E HWS-2101CSHM3-E(-UK) HWS-3001CSHM3-E(-UK) HWS-802XWHM3-E HWS-802H-E HWS-802XWHT6-E

1 168
Download 168 pages 43.83 Kb
Page 57
Image 57
3. Hydro Unit

Item

Operation flow and applicable data, etc.

 

 

 

 

 

 

 

3. Hydro Unit

10) Room temperature thermostat control (Option

 

 

 

 

 

TCB-PCMO3E

 

 

 

 

Control

board TCB-PCM03E is necessary. Connect

PJ17

 

the connection cable to the water heat

 

 

 

 

 

 

 

 

exchange board CN211.)

 

 

 

 

 

 

When the room thermostat is connected and

 

 

 

 

 

 

heating or cooling operates with DP_SW12-4

 

 

 

CN210

 

set to ON, an room thermostat operation is

 

 

 

 

 

 

 

Red

 

performed.

 

 

 

 

 

 

 

 

 

CN211

Black

Terminal label

10-1)Heating thermostat operation

When the heating room thermostat is OPEN, the usual heating AUTO operation is performed.

After 30 minutes has passed, if the heating room thermostat continues to be in the OPEN status, the operation raises the water temperature by 1 degree every 30 minutes. The same heater control as that of the usual HP operation applies to the backup heater and booster heater.

When the heating room thermostat is CLOSE, the heat pump performs thermostat off. During the thermostat off, the operation lowers the set water temperature by 1 deg every 30 minutes. When the thermostat off is completed, the backup heater and booster heater stops being energized.

10-2)Cooling thermostat operation

When the cooling room thermostat is CLOSE, the usual cooling operation is performed. (Initial set water temperature 20°C)

After 30 minutes has passed, if the room thermostat continues to be in the OPEN status, the operation lowers the water temperature by 1°C every 30 minutes.

When the cooling room thermostat is OPEN, the heat pump performs thermostat off. During the thermostat off, the operation raises the set water temperature by 1 degree every 30 minutes.

Indoor thermostat

Correction control

Heating operation

Cooling operation

contact point

 

 

 

 

 

 

 

OPEN

Setting shift UP

Thermostat ON

Thermostat OFF

 

 

Up water temperature by 1 deg every 30

Lower water temperature by 1 deg every

 

 

mins

30 mins

 

 

 

 

CLOSE

Setting shift DOWN

Thermostat OFF

Thermostat ON

 

 

Lower water temperature by 1 deg every

Up water temperature by 1 deg every 30

 

 

30 mins

mins

 

 

 

 

11)Forcible stop control (Option board TCB-PCMO3E is necessary. Connect the connection cable to the water heat exchange board CN210.)

When CLOSE occurs between "HEAT" and "COM" of TCB-PCM03E, the RED LED on the option board lights and the operation (hot water supply, heating, cooling) stops. To restart the operation, use the operation button of the remote controller.

12)Output signal control 1 (Option board TCB-PCIN3E is necessary. Connect the connection cable to the water heat exchange board CN208.)

If an error detecting signal is output, CLOSE occurs between the terminal 1 and 2.

If a boiler output signal is output, CLOSE occurs between the terminal 3 and 4.

In either signal above is output, the red LED on the Option board lights.

13)Output signal control 2 (Option board TCB-

PCIN3E is necessary. Connect the connection TCB-PCIN3E

PJ20

CN208

cable to the water heat exchange board

 

Blue

CN209.)

 

 

 

• When defrosting is in operation, CLOSE occurs between the terminal 1 and 2.

• When the compressor is in operation, CLOSE occurs between the terminal 3 and 4.

In either signal above is output, the red LED on the OP board lights.

CN209

Green

Terminal label

56

Page 57
Image 57
Toshiba HWS-1402XWHT6-E, HWS-802XWHT6-E, HWS-802H-E, HWS-802XWHM3-E, HWS-3001CSHM3-E(-UK), HWS-2101CSHM3-E(-UK) Hydro Unit