Item | Operation flow and applicable data, etc. | |||||
|
|
|
|
|
|
|
3. Hydro Unit | 10) Room temperature thermostat control (Option |
|
|
|
|
|
|
|
|
| |||
Control | board | PJ17 | ||||
| the connection cable to the water heat |
| ||||
|
|
|
|
|
| |
| exchange board CN211.) |
|
|
|
|
|
| When the room thermostat is connected and |
|
|
|
|
|
| heating or cooling operates with |
|
|
| CN210 | |
| set to ON, an room thermostat operation is |
|
|
| ||
|
|
|
| Red | ||
| performed. |
|
|
| ||
|
|
|
|
|
|
CN211
Black
Terminal label
When the heating room thermostat is OPEN, the usual heating AUTO operation is performed.
After 30 minutes has passed, if the heating room thermostat continues to be in the OPEN status, the operation raises the water temperature by 1 degree every 30 minutes. The same heater control as that of the usual HP operation applies to the backup heater and booster heater.
When the heating room thermostat is CLOSE, the heat pump performs thermostat off. During the thermostat off, the operation lowers the set water temperature by 1 deg every 30 minutes. When the thermostat off is completed, the backup heater and booster heater stops being energized.
When the cooling room thermostat is CLOSE, the usual cooling operation is performed. (Initial set water temperature 20°C)
After 30 minutes has passed, if the room thermostat continues to be in the OPEN status, the operation lowers the water temperature by 1°C every 30 minutes.
When the cooling room thermostat is OPEN, the heat pump performs thermostat off. During the thermostat off, the operation raises the set water temperature by 1 degree every 30 minutes.
Indoor thermostat | Correction control | Heating operation | Cooling operation | |
contact point | ||||
|
|
| ||
|
|
|
| |
OPEN | Setting shift UP | Thermostat ON | Thermostat OFF | |
|
| Up water temperature by 1 deg every 30 | Lower water temperature by 1 deg every | |
|
| mins | 30 mins | |
|
|
|
| |
CLOSE | Setting shift DOWN | Thermostat OFF | Thermostat ON | |
|
| Lower water temperature by 1 deg every | Up water temperature by 1 deg every 30 | |
|
| 30 mins | mins | |
|
|
|
|
11)Forcible stop control (Option board
•When CLOSE occurs between "HEAT" and "COM" of
12)Output signal control 1 (Option board
•If an error detecting signal is output, CLOSE occurs between the terminal 1 and 2.
•If a boiler output signal is output, CLOSE occurs between the terminal 3 and 4.
•In either signal above is output, the red LED on the Option board lights.
13)Output signal control 2 (Option board TCB-
PCIN3E is necessary. Connect the connection | PJ20 | CN208 |
cable to the water heat exchange board |
| Blue |
CN209.) |
| |
|
|
• When defrosting is in operation, CLOSE occurs between the terminal 1 and 2.
• When the compressor is in operation, CLOSE occurs between the terminal 3 and 4.
In either signal above is output, the red LED on the OP board lights.
CN209
Green
Terminal label
56