EOI Remote Mounting using the ASD-MTG-KIT

Note: See Figures 20 and 21 for the dimensions and the item locations referenced in steps 1 through 6.

1.At the EOI mounting location, identify and mark the locations of the 5.00” by 4.60” hole and the four 11/32” screw holes.

2.Cut the 5.00” by 4.60” rectangular hole.

3.Drill the four 11/32” holes.

4.Attach and secure the Bezel plate to the front side of the mounting location using the four 10-32 hex nuts, #10 split lock washers, and the #10 flat washers.

5.Attach and secure the EOI to the front side of the Bezel plate using the four 6-32 x 5/16” pan head screws, the #6 flat washers, and the #6 split lock washers.

6.Connect the RJ-45 extension cable(s).

EOI ASD-MTG-KIT Dimensions (mounting)

Figure 20. EOI Bezel Plate Mounting Dimensions.

Mounting Hole

5.00

11/32" Screw Hole (4)

4.25

5.38

4.60

Bezel Plate

 

Bezel Plate

Front View

Side View

Back View

Figure 21. Screw Length Precaution.

CAUTION: Failure to use the correct hardware may result in damage to the outer surface of the EOI panel and/or improper seating of the panel to the bezel plate. Use caution when mounting the EOI assembly to ensure that the internal thread clearance is maintained.

Correct

Incorrect

W7 ASD Installation and Operation Manual

29

Page 35
Image 35
Toshiba W7 manual EOI Remote Mounting using the ASD-MTG-KIT, EOI Bezel Plate Mounting Dimensions