AC Power Requirements
●The System 25 power service shall be a dedicated branch circuit with no other equipment served (See Figure
●Each cabinet requires 500 Watts at 115V ac (maximum)
● Provide a load center of appropriate current rating (ITE EQ4 typical) equipped with 120V ac, 15 ampere (AMP), single pole magnetic circuit breaker(s) (ITE
The following materials are required:
A.Single Cabinet System
1 - 15 AMP 3 Wire Dedicated Branch Service
1 - 4“ Box (RACO 230 or Equiv.)
1 - 4“ Cover (RACO 807 or Equiv.)
1 - Ground Bar (Square D PK9GTA or Equiv.)
2 - Recpt. (Hubbell 5262 15 AMP or Equiv.)
B.Multiple Cabinet System
2 - 15 AMP 3 Wire Dedicated Branch Service
2 - 4“ Box (RACO 230 or Equiv.)
2 - 4“ Cover (RACO 807 or Equiv.)
1 - Ground Bar (Square D PK9GTA or Equiv.)
4 - Recpt. (Hubbell 526215 AMP or Equiv.)
C.Typically, multiple cabinet systems can be powered from a single phase 120V ac, 60 Hertz service (two 15 amp circuits required. ) There are no phase restrictions between cabinets. Therefore the two 15 amp circuits required may be derived from single or
D.The receptacles shall be located at least 1 foot above the floor. Receptacles shall not be located further than 4 feet from the cabinets.
DANGER
Under no circumstances should this equipment
be connected to 220V ac; doing so poses a
serious fire hazard.
6 - 6