Cisco Systems 7500 Series manual Panel end

Models: 7500 Series

1 303
Download 303 pages 5.48 Kb
Page 99
Image 99

Chapter 2 Preparing for Installation

Equipment Rack-Mounting Guidelines

Figure 2-12 Chassis Footprint and Outer Dimensions (Cisco 7513, Cisco 7513-MX, and Cisco 7576)

19 in. required

for blower removal

18.93

in.

1.75 in. 4 places

12.73 in.

18.75

in.

21.23

in.

3.94 in.

 

1.47

Plastic front

in.

panel end

 

14.57

 

in.

 

 

17.50

 

in.

H3178

 

Caution To prevent chassis overheating, never install the router in an enclosed rack or room that is not properly ventilated or air-conditioned.

When planning your Cisco 7513, Cisco 7513-MX, or Cisco 7576 rack installation, consider the following guidelines:

Install the router in an open rack whenever possible. If installation in an enclosed rack is unavoidable, ensure that the rack has adequate ventilation.

If you plan to use an equipment shelf, ensure that the shelf is constructed to support the weight and dimensions of the chassis. Figure 2-12shows the chassis footprint, which you will need if you are designing a customized shelf. We recommend that you use the rack-mount kit designed for the Cisco 7513, Cisco 7513-MX, and Cisco 7576.

Allow sufficient clearance around the rack for maintenance. If the rack is mobile, you can push it back near a wall or cabinet for normal operation and pull it out when necessary for maintenance (installing or moving interface processors, connecting cables, or replacing or upgrading components). Otherwise, allow 19 inches (48.3 cm) of clearance to remove the blower module, power supplies, and processor modules.

 

 

Cisco 7500 Series Installation and Configuration Guide

 

 

 

 

 

 

OL-5008-03 B0

 

 

2-21

 

 

 

 

 

Page 99
Image 99
Cisco Systems 7500 Series manual Panel end