Chapter 2 Preparing for Installation

Equipment Rack-Mounting Guidelines

Figure 2-11 Chassis Footprint and Outer Dimensions (Cisco 7507 and Cisco 7507-MX)

 

 

 

 

 

Power supply/interface processor end

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10 in. clearance

 

 

required for

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16 in. clearance required

 

 

 

 

 

 

 

 

 

 

interface processor removal

for power supply removal

 

 

 

 

 

1.220 in.

 

 

(28 in. including

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

power cord)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Foot diameter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 in.

 

 

 

 

 

 

 

 

 

1.125 in.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.095 in.

4 places

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16 in.

13 in.

25 in.

16.916 in.

Foot thread size 5/16 in.

4 places

15.060 in.

17.5 in.

Plastic front panel end

H9716

Caution To prevent overheating, never install the router in an enclosed rack that is not properly ventilated or air conditioned.

When planning your Cisco 7507 or Cisco 7507-MX rack installation, consider the following guidelines:

Allow at least 3 to 4 feet (0.91 to 1.22 m) of clearance behind the rack for maintenance. If the rack is mobile, you can push it back within 1 foot (0.3 m) of a wall or cabinet for normal operation and pull it out when necessary for maintenance (installing or replacing interface processors or power supplies, or connecting network cables or interface units).

The ports for cooling air are located on the front and rear of the chassis, so multiple routers can be rack-mounted with little or no vertical clearance. However, avoid placing the router in an overly congested rack.

Consider the equipment and cabling that is already installed in the rack. Ensure that cables from other equipment will not obstruct the airflow through the chassis or impair access to the power supplies or interface processors. Route cables away from field-replaceable components to avoid having to disconnect cables unnecessarily to perform equipment maintenance or upgrades.

Install heavier equipment in the lower half of the rack to maintain a low center of gravity.

 

 