01.2004

Transport, Storage, Unpacking

 

 

4 Transport, Storage, Unpacking

Transport

Storage

NOTE

Unpacking

Scope of delivery type G

The units and components are packed in the manufacturing plant corresponding to that specified when ordered. A packing label is located on the outside of the packaging. Please observe the instructions on the packaging for transport, storage and professional handling.

Vibrations and jolts must be avoided during transport. If the unit is damaged, you must inform your shipping company immediately.

The units and components must be stored in clean, dry rooms. Temperatures between -25 °C (-13 °F) and +70 °C (158 °F) are permissible. Temperature fluctuations must not be more than 30 K per hour.

If the storage period of one year is exceeded, the unit must be newly formed.

The packaging comprises board and corrugated paper. It can be disposed of corresponding to the appropriate local regulations for the disposal of board products. The units and components can be installed and commissioned after they have been unpacked and checked to ensure that everything is complete and that they are not damaged.

Line-side components and their combination:

1. AFE reactor

6SE703_-_ES87-1FG1

 

2-1: for 210 A

AFE inverters

 

2-6: for 260 A

AFE inverters

 

3-2: for 315 A

AFE inverters

 

3-7: for 370 A

AFE inverters

2. CleanPower filter

6SE703_-_ED87-1FC5

 

2-1: for 210 A

AFE inverters

 

2-6: for 260 A

AFE inverters

 

6SE703_-_EE87-1FC5

 

3-2: for 315 A

AFE inverters

 

3-7: for 370 A

AFE inverters

3.AFE basic mains module 6SE7033-7ED83-2NB1 (with cable harness), for 370 A AFE inverters

6SE7033-2ED83-2NB1 (with cable harness),

for AFE inverters from 210 A to 315 A

Siemens AG 6SE7087-6CX86-2BA1

4-1

SIMOVERT MASTERDRIVES AFE Operating Instructions

Page 16
Image 16
Siemens 400 V / 210...590 A Transport, Storage, Unpacking, Transport Storage Unpacking Scope of delivery type G