01.2004

Basic Function Check

 

 

8 Basic Function Check

WARNING

It imperative to observe the procedure described here for initial

 

commissioning of the equipment.

Control transformer AC230 V 50/60Hz

-T10 1 kVA

-Q1

Vmains

3AC 50/60 Hz

Main fuses

Type: Combined fuse or line protection

-G10

DC 24 V / 6 A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AFE basic mains

-X70

 

 

 

 

 

 

 

module

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-K4

-R1...R3

VSB

-K1

 

 

L1

 

 

Cg

 

 

-R7...R9

 

 

-C4...C5

 

CleanPower filter

-X9

cable harness

6

AFE reactor

-L2

-X2

E box: Options

CUSA control/control section

6

Vd

-U1: AFE inverter

Please check:

Starting state:

1.

Main switch (or no-load fuse-disconnector)

 

 

 

-Q1 is open

 

 

2.

Mains is connected to the main switch-Q1 in clockwise

 

 

 

phase sequence (L1, L2, L3)

 

 

3.

Control cabling (cable harness, precharging, power

 

 

 

supply, fan supply) is complete;

 

 

 

Cable harness securely attached (cf. Chapter 7 "Typical

 

 

 

circuit")

 

 

4.

Power cabling

 

 

 

AFE reactor, phase assignment check

 

 

 

Connection to AFE inverter and CleanPower filter

 

 

 

(cf. Chapter 7 "Typical circuit")

 

 

5.

DC link connection not yet connected to motor inverter

 

 

6.

No further control cables are connected, no

 

 

 

communication

Siemens AG 6SE7087-6CX86-2BA1

8-1

SIMOVERT MASTERDRIVES AFE Operating Instructions

Page 53
Image 53
Siemens 400 V / 210...590 A operating instructions Basic Function Check, Commissioning of the equipment, Please check