Siemens 400 V / 210...590 A operating instructions Installing the optional boards

Models: 400 V / 210...590 A

1 166
Download 166 pages 35.09 Kb
Page 31
Image 31

01.2004

Installation

 

 

5.3Installing the optional boards

WARNING

The boards may only be replaced by qualified personnel.

 

It is not permitted to withdraw or insert the boards under voltage.

The electronics box of the unit contains up to three slots in which you can insert optional boards.

The LBA (Local Bus Adapter) can hold either the adapter board (ADB) or optional boards.

An ADB (Adapter Board) can accommodate up to two optional boards.

Slot 1

Slot 3

Slot 2

Fig. 5-9 Location of slots for chassis units

NOTE

Slot 2 can be used for technology boards (T100, T300, TSY).

 

Slots 2 and 3 can also be used for communication boards SCB1 and

 

SCB2.

WARNING

 

The unit has hazardous voltage levels up to 5 minutes after it has been

 

powered down due to the DC link capacitors. The unit must not be

 

opened until at least after this delay time.

 

 

Siemens AG 6SE7087-6CX86-2BA1

5-13

SIMOVERT MASTERDRIVES AFE Operating Instructions

Page 31
Image 31
Siemens 400 V / 210...590 A Installing the optional boards, Boards may only be replaced by qualified personnel