5-7. CUE Head Head-to-tape Contact Adjustment

5-7. CUE Head Head-to-tape Contact Adjustment

Notes

.The CUE head head-to-tape contact adjustment is closely related to the height, azimuth and position adjustments of the CUE head.

.After carry out the CUE head head-to-tape contact adjustment, be sure to carry out the adjustments or checks of the CUE head.

Tools

 

. Alignment tape, ZR2-1 (NTSC)

: 8-960-073-11

. Alignment tape, ZR2-1P (PAL)

: 8-960-073-61

. Torque screwdriver bit (for M2)

: J-6325-380-A

. Torque screwdriver (for 3 kg)

: J-6325-400-A

. TP tool

: J-6420-910-A

. Oscilloscope

 

Setting

1.Turn the power off.

2.Connect the 8-pin connector of the TP tool to the connector CN7 on the HN-260 board.

3.Connect the 5-pin connector of the TP tool to the connector CN3 on the CTL-10 board.

4.Select the switches S1-1 and S1-2 on the HN-260 board to the OFF.

5.Connect an oscilloscope. CH-1: PB CUE/TP tool TRIG: CH-1

6.Turn the power on.

7.Insert the alignment tape ZR2-1/P.

DVW-790WS/709WS/707

5-25

DVW-790WSP/709WSP/707P P2V1

 

Page 235
Image 235
Sony DVW-709WS/709WSP, DVW-790WS/790WSP manual CUE Head Head-to-tape Contact Adjustment